|
Ibbs,
W and Nguyen, L. D. (2011) "Cases and Board Decisions on Cumulative
Impact Claims" The
Construction Lawyer, 31(4),
32-41. Full
Paper.
Nguyen, L. D. and Ibbs, W. (2010) "Case Law
and Variations in Cumulative Impact Productivity Claims." Journal of Construction Engineering and
Management, ASCE, 136(8), 826-833.
Full
Paper.
Ibbs, W. (2008) "The Cumulative Impact of
Change on Construction Labor Productivity." Full Paper.
Nguyen, L. D. and Ibbs, W. (2008) "FLORA: New
Forensic Schedule Analysis Technique." Journal of Construction Engineering and
Management, ASCE, 134(7) (in
press). Full
Paper.
Ibbs, W., Nguyen, L. D. and Lee, S.
(2007) "Quantified Impacts of Project Change." Journal of Professional Issues in
Engineering Education and Practice, ASCE,
133(1), 45-52. Full Paper.
Ibbs, W. and Nguyen, L. D. (2007)
"Alternative for Quantifying Field-Overhead Damages." Journal of Construction Engineering and
Management, ASCE, 133(10),
735-742. Full
Paper.
Ibbs, W. and Nguyen, L. D. (2007)
"Schedule Analysis under the Effect of Resource Allocation." Journal of Construction Engineering and
Management, ASCE, 133(2), 131-138.
Full
Paper.
Nguyen, L. D. and Ibbs, W. (2006) "Delay Analysis Considering Resource
Allocation." In Proceedings of the 31st Annual
Conference of the Australasian
Universities Building Educators Association (AUBEA) (ISBN
0-9775325-0-X), July 12-14, 2006, Sydney, Australia. Full Paper.
Ibbs, W. and Liu, M. (2005)
"Improved Measured Mile Analysis Technique." Journal of Construction Engineering &
Management, ASCE, 131(12),
1249-1256. Full Paper.
Ibbs, W. "The Impact of Change's
Timing on Labor Productivity." Journal
of Construction Engineering & Management, ASCE, 131(11), November 2005, 1219-1223. Full
Paper.
Ibbs, W. and Liu, M. (2005)
"System Dynamic Modeling of Delay and Disruption Claims." Cost Engineering,
AACE, 47(6). Full Paper
Ibbs, W., Nguyen, L. D., Shumway, R.
and Hughes, R. M. (2005) "A Checklist to Avoid
False Claims." Construction
Claims Online, 3(17). Full Paper
Ibbs, W. (2003) "The Impact of
Change's Timing on Labor Productivity." Full Paper
Lee, E.
B., Roesler, J. R.,
Harvey, J. T. and Ibbs, C. W. (2001) "Case
Study of Urban Concrete Pavement Reconstruction and Traffic Management for
the I-10 (Pomona, CA) Project." Report prepared for Innovative
Pavement Research Foundation (IPRF). Full Report
Disruption
and Their Impact
See
our new comprehensive Field Manager's Guide to Quantifying Project
Change.
Presentations
Ibbs, C. W. (2005) "Best Project Management Practices for
the Bay Bridge Project." Presented to the Joint State Legislative
Audit Committee, CA. Full Presentation
Documents on this page are in PDF format. You may require
the Adobe Acrobat Reader, which is freely available at:

|